MEET G2 Gigabit broadband. At a whole new scale.
DatasheetOfficial Tarana documentNo form on this page

ngFWA Platform Datasheet

Review the product family, open the official specifications, and turn the relevant RF, networking, power, and operating requirements into a deployment checklist.

Summary

The ngFWA platform datasheet brings the product family into one technical reference. Use it to review model-specific RF, networking, mechanical, and power requirements before a deployment.

At a Glance

Product familyG1 and G2 Base Nodes · Remote Nodes
G2 capacity6.4 Gbps per sector
OperationNon-line-of-sight engineering · Interference cancellation
ManagementTarana Cloud Suite
Full detailsUse the current manufacturer document linked here

Inside the Document

  1. Platform and product overview
  2. RF and networking specifications
  3. Mechanical, environmental, and power details
  4. Model-specific capabilities and conditions

Visit the Official Product Page

Turn the datasheet
into a deployment requirement.

Specification areaReview with your engineering teamEvidence before procurement
RF and spectrumBand, channel plan, bandwidth, antenna characteristics, and permitted configuration.Local authorization and a link plan for the intended installation.
Capacity and serviceSector capacity, remote-node limits, and uplink/downlink assumptions.A service-tier and busy-hour load model with defined headroom.
Network interfacesHandoff, cabling, transport, addressing, and management requirements.An approved integration design with the operator’s network.
Power and environmentInput power, supply and cabling, operating conditions, dimensions, weight, and mounting.A site survey covering structural suitability, grounding, surge protection, and backup power.
Software and compatibilityThe selected Base Node, Remote Node, software release, and supported features.A verified bill of materials and staged upgrade plan.
Operations and supportProvisioning, alarms, access controls, spares, and support scope.An installation standard, acceptance record, and operating runbook.
Which Document Should Procurement Attach to the Order?

Use the manufacturer’s applicable model-specific datasheet and the agreed software and configuration requirements. Record the document revision and date with the quote so all teams are evaluating the same product.

Can a Headline Capacity Figure Serve as an SLA?

No. A product limit is not a service commitment. Define the customer service level from the engineered configuration, field validation, capacity plan, and operating agreement.

How Should We Compare Proposals?

Normalize the service area, service tiers, spectrum assumptions, installation scope, support terms, and planning horizon. Resolve exclusions before comparing a hardware total with a fully installed network cost.

Search Tarana